There are 2 core switches and an edge switch. There is an ISC Link between the core switches. The Edge Switch should be connected via "Regular LAG" to both cores through port 1 and port 2. CONFIGURING MLAG "Edge on two Cores" Does it mean we should configure Port Sharing an the Edge?
enable sharing 1 grouping 1,2
There is only ONE Port "1" on the Edge later. CONFIGURING MLAG "Core on two Edges" Because of the shared Port 1(1+2) there is no chance to configure it.